Robot Deployment Projects
Explore robot deployment projects from Digicorp Robotics. See how site requirements, task design and handovers shape each robot solution.
Robot deployment projects
This collection brings together robot deployment projects from Digicorp Robotics. Use each project to understand the operating context, the tasks assigned to the robot, and the handovers that staff continue to manage.
Selected robot deployment projects
Restaurants and hospitality. Digicorp Robotics has deployed hundreds of robots across the Golden Gate Group restaurant network, including locations under Kichi-Kichi, Manwah, CloudPot, K-Pub and Dao Niu Guo. Other projects include The Cheezy Time in Can Tho, Premier Pearl Vung Tau, and Hàng Dương Quán in District 7, Ho Chi Minh City, where the team deployed the Autoxing Mars (AX1612) service robot.

Factories and electronics. Selected projects include Autoxing AX6114 at Thành Công, AX6113 at Gennex Apparel, and the AX8112 lifting robot at Gunzetal. Digicorp Robotics has also supplied robot solutions to factories in the electronics supply chain, including plants with surface-mount technology (SMT) lines.

What to look for in each project
Start with the site and task, rather than the robot model alone. For restaurant teams, look at where trays are loaded and received. For factories and warehouses, look at the load carrier, pickup station and destination. For buildings, check whether a route involves shared corridors, access controls or elevators.
How to compare a project with your site
Two businesses using the same model can need different route layouts, charging arrangements and handover procedures. Before using a project as a reference, compare the type of load, usable aisle width, traffic by shift, and the people responsible for the two ends of the route.
What to prepare for a pilot
Bring a floor plan, typical loads, trip counts and a list of exceptions that staff handle today. Agree on how to record completed trips, waiting time and interventions. Treat the reported scope of a project as specific to that site.
Restaurant robots · Factory robots · Contact Digicorp Robotics
Questions to ask when reviewing robot deployment projects
Can the same model work at my site? A published example helps identify options, but it does not replace a site survey. Verify how the load is presented, where the robot waits, and whether handovers are staffed in each shift.
What should a pilot demonstrate? Agree on the task and a representative shift, then record completed trips, delays and intervention reasons. Include changes such as a blocked drop-off or a temporary route closure and define who handles them.
How to read the scope of a case study
Start by separating the task the robot performs from the process around it. A robot may carry material between two stations, while staff still prepare and verify the load. Note whether the example describes a pilot, a routine operation, or an expansion to more routes. These are different stages and should not be compared as if they were equivalent.
Document conditions that can change the result
A layout drawing is useful, but it does not show every temporary obstruction or shift handover. Record when aisles are busy, where goods are staged, and what happens when the receiving station is unavailable. If the route crosses multiple floors, identify who controls elevator access and what staff should do when a delivery cannot be completed.
Use project information to prepare a site survey
List which details are directly comparable and which need verification. Take the route plan, examples of loads, and a breakdown of trips by shift to the survey. Agree on what staff will confirm at each handover and which events require manual intervention. A useful pilot answers whether the handover works reliably in your own process, rather than whether the robot can complete a demonstration under ideal conditions.